{"id":18128,"date":"2026-11-16T08:56:58","date_gmt":"2026-11-16T13:56:58","guid":{"rendered":"https:\/\/www.radioguantanamo.icrt.cu\/english\/?p=18128"},"modified":"2026-11-16T10:09:27","modified_gmt":"2026-11-16T15:09:27","slug":"guiteras-thermal-power-plant-successfully-completes-hydraulic-test","status":"publish","type":"post","link":"https:\/\/www.radioguantanamo.icrt.cu\/english\/guiteras-thermal-power-plant-successfully-completes-hydraulic-test\/","title":{"rendered":"Guiteras Thermal Power Plant Successfully Completes Hydraulic Test"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-18129 size-full\" src=\"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-content\/uploads\/2026\/11\/cte-antonio-guiteras-termoelectrica-raul-6-1024x671-2-580x380-1.jpg\" alt=\"\" width=\"580\" height=\"380\" srcset=\"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-content\/uploads\/2026\/11\/cte-antonio-guiteras-termoelectrica-raul-6-1024x671-2-580x380-1.jpg 580w, https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-content\/uploads\/2026\/11\/cte-antonio-guiteras-termoelectrica-raul-6-1024x671-2-580x380-1-300x197.jpg 300w\" sizes=\"auto, (max-width: 580px) 100vw, 580px\" \/>Guantanamo.- The Antonio Guiteras Thermal Power Plant has successfully completed a hydraulic test at 120 bar, with no leaks detected. The result marks a key step in the protocol ahead of the plant\u2019s startup.<\/p>\n<p>Following the successful test, workers removed the scaffolding and began sealing the boiler, the plant reported through its official channels.<\/p>\n<p>Engineer Elmer Garc\u00eda Romero, the plant\u2019s deputy technical director, confirmed that the hydraulic and pneumatic tests and the metallographic inspection of the welds were all completed successfully. \u201cA tense Sunday ends with good news,\u201d the plant said in its report.<\/p>\n<p>With testing complete, workers expect to spend nearly two hours sealing the access points and finishing the remaining tasks. They will then ignite the boiler and continue the startup process until the unit synchronizes with the grid, potentially in the early hours of Monday.<\/p>\n<p>The startup team is prepared to oversee the next phase, bringing the Antonio Guiteras plant closer to rejoining the National Electric System.<\/p>\n<p>Source: Cubadebate<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Guantanamo.- The Antonio Guiteras Thermal Power Plant has successfully completed a hydraulic test at 120 bar, with no leaks detected. The result marks a key step in the protocol ahead of the plant\u2019s startup. Following the successful test, workers removed the scaffolding and began sealing the boiler, the plant reported through its official channels. Engineer [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18129,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37,28,7],"tags":[],"class_list":["post-18128","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cuba","category-economy","category-news"],"_links":{"self":[{"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/posts\/18128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/comments?post=18128"}],"version-history":[{"count":1,"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/posts\/18128\/revisions"}],"predecessor-version":[{"id":18130,"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/posts\/18128\/revisions\/18130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/media\/18129"}],"wp:attachment":[{"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/media?parent=18128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/categories?post=18128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.radioguantanamo.icrt.cu\/english\/wp-json\/wp\/v2\/tags?post=18128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}